National Broadband Network in the Middle Region of The Kingdom

Project Name : National Broadband Network in the Middle Region of The Kingdom
Client : Ministry of information and Communication Technology(MoICT)
End Date : 2016
Contract Value : 23 681 428 JD
Scope:
Approximately (680 Km) of excavating and execution of all required civil works, the supply & installation of manholes, hand-holes, pull-boxes and accessories as per specifications.
Additionally the supply & installation of the required ducts. The ducts consists of FOUR (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube or Two (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between manholes, handholes and pull boxes, or ONE (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between, handholes and pull boxes to make the transition from aerial to duct cable.
The supply, installation, and termination of approximately (1070 Km) of optical fiber cables in ducts installed within the project scope, supply and installation of required accessories (ODF, splicing enclosures, splicing boxes and optical patch panels, pigtails, etc…), splicing of the cables, and end-to-end testing of installed optical network.
Sufficient spare fiber cable shall be installed within selected manholes.
Fiber jointing with existing aerial or duct fiber cables for ring completion.

KS90DSF9917

International Airport Highway Expansion Section B

Project Name : International Airport Highway Expansion Section B
Client : Ministry of Public Works and Housing
End Date : 2013
Contract Value : 43 000 000 JD
Scope:
Highway construction of 10km 6 lane divided main highway and 22km 4 lane service road, 4 under passes drainage and protection works, Street lighting and telecommunication network.
Bulk quantities: 1.0 million cu m earthworks, 450,000 cu m aggregate base course, 200,000 tons asphalt, 30,000 cu m concrete works, 1,800 tons steel re-bar, three pedestrian street bridges, landscaping and irrigation works, street lighting and telecommunication network.

20140306_105504

Execution of T-Shelters Units in Mukhezen

Project Name : Execution of T-Shelters Units in Mukhezen Camp/ Azraq
Project no. (132-133/2013),(9+10/2014) (52/2014).
Client : Ministry of Housing and Public Works/ United Nation High Commissioner for Refugees (UNCHR)
End Date : 2014
Contract Value : 2 620 250 JD
Scope:
Supply and built T-shelters pilot Unit (1800 Unit) on a fast track basis to accommodate the influx of refugees.

National Broadband Network in the South Region of The Kingdom

National Broadband Network in the South Region of The Kingdom

Project Name : National Broadband Network in the South Region
Client : Ministry of Information and Communication Technology(MoICT)
End Date : 2016
Contract Value : 22 258 400 JD
Scope:
Approximately (521 Km) of excavating and execution of all required civil works, the supply & installation of manholes, hand-holes, pull-boxes and accessories as per specifications.
Additionally the supply & installation of the required ducts. The ducts consists of FOUR (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube or Two (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between manholes, handholes and pull boxes, or ONE (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between, handholes and pull boxes to make the transition from aerial to duct cable.
The supply, installation, and termination of approximately (838 Km) of optical fiber cables in ducts installed within the project scope, supply and installation of required accessories (ODF, splicing enclosures, splicing boxes and optical patch panels, pigtails, etc…), splicing of the cables, and end-to-end testing of installed optical network.
Sufficient spare fiber cable shall be installed within selected manholes. The supply, installation, and termination of approximately (740 km) of aerial optical fiber cables with all related accessories and fittings on existing electrical (and new) poles medium and low voltage electricity poles as per agreement with the concerned authority.
Fiber jointing with existing aerial or duct fiber cables for ring completion.

11111598_1074310495920716_3631827729617737285_o

Ayla Island Apartments


Project Name :
 
Ayla Island Apartments 1 & 4 and Blocks 15 & 16
Client : Oasis Real Estate Development CO.
End Date : 2016
Project Value : 19 148 895 JD
Scope:
The island apartments sit on a series of 2 islands (out of 4 islands) with bridge link to the mainland on the southern side of the marina lagoon, an estimated built up area of 27000 m2.
Project consists of 3 storey appartment complexes with external pools and landscaping.
Works included civil, MEP and finishing packages.

Zarqa- Azraq- Omary Highway- Section 1

Omary Highway

Project Name : Zarqa- Azraq- Omary Highway- Section 1
Reconstruction & Upgrading of Zarqa- Azraq Highway
Client : Ministry of Public Works and Housing
End Date : 2017
Contract Value : 99 066 226 JD
Scope :
Construction of approximately (47.3 km) of existing road to four lanes devided highway by new construction of two lanes adjacent to the existing road, and rehabilitation of the existing road dual carriageway with 2x 3.75 m travel lanes in each direction plus 3.0 m outer shoulder and 1.8 m inner shoulders, and a central median of 2.0 m wide.

Construction of service roads at each side for about 4 km. Construction of two fully directional interchanges and three overpassess over the main road for minor cross roads, in addition to slip ramps, cross roads diversions and tapers, construction of roundabout at station 0-000, construction of retaining walls and drainings structures consisting.

Relocation, realignment and diversion of existing utilities. Street lighting civil works for interchanges. Street lighting installations for the interchanges and service roads. Traffic signing and traffic marking. Traffic safety installations and slope protection treatments. Drainage works including culverts, dykes, slope protection and ditches.